A web site has been chosen for a brand new $80-million Adelaide aquatic centre, with South Australian premier Peter Malinauskas revealing the brand new location in early September.
The brand new centre, designed by JPE Design Studio and Warren and Mahoney, can be constructed simply south of the present parklands web site, North Adelaide, on an oval within the south-western quadrant of Denise Norton Park.
The location has been chosen to exchange that of the getting old centre run by Adelaide Metropolis Council, which has been deemed now not match for objective after a lot of its amenities, together with diving boards and spas, have closed due to security considerations. As soon as the 50-year-old facility is demolished, this web site can be returned to group parkland.
The announcement follows a four-month public session interval, which garnered practically 1,000 submissions from locals and pool customers, with 55 % backing the south-west location. Malinauskas stated the south-western web site was most well-liked as a result of it will end result within the least variety of felled timber within the growth course of.
Adelaide-based structure follow JPE Design Studio will work with aquatic and recreation structure specialists Warren and Mahoney to design a extra trendy and accessible facility, with the design part slated to take round 9 months.
Infrastructure minister Tom Koutsantonis stated the brand new web site may have the identical footprint as the present centre, as soon as it opens in 2026.
“When it comes to the square-meterage it’ll in all probability be like for like, nevertheless it could be a distinct configuration,” stated Koutsantonis. “What we’ve determined to do is to set it again to attempt to retain as many timber and vegetation as we presumably can.”
Malinauskas stated that the present aquatic centre would keep open whereas the substitute facility is constructed, with building beginning in 2023.